In David Marquet’s 2012 book, Turn The Ship Around, his whole effort in making the USS Santa Fe the model of excellence was to change the crew’s attitude from “not making mistakes” to “creating operational excellence”. Although he barely touches on the concept of Mission Command (to be fair Stephen Bungay’s book on the subject – Art of Action was only published this year) – it was Mission Command / Centralised Intent that he was implementing throughout his boat.
We introduced and have been covering the initial 2 of the 8 Stages of Mission Command in three previous blogs.

Last time we covered Stage 2, and this time we’ll address Stage 3.

3. What Outcomes are the Solutions expected to Deliver? And Why?
a. Analyse the Desired State: Having worked through the Steps in Stages 1 and 2 above, the manager is now ready to express and make clear his/her own intent. What are the effects he/she wants to have on the situation, the purpose of each effect and the ways progress can be measured? It may even be helpful to outline a selected solution (from the Possible Solutions in previous Stage 2). Typically, the desired state is articulated with clarity and simplicity – e.g. as verb-object.
For example, working with a large Police Force: In an Understanding Demand Project, the Desired State is expressed as Improve the Flow of Work. This can only be done by examining each Flow in its own right. For example, there is a Flow associated with Preventing Burglaries, a separate Flow associated with Allocating Crimes to Detectives to Investigate etc. Then there is the necessity to Monitor and Evaluate any improvement Action. This means using the appropriate Measures (and Measurement Methods) to measure the result of the change.
For example, working with a large Police Force on a larger scale: Working out from the PCC Crime and Policing Plan, one Desired State is expressed as Prevent, Solve and Reduce Crime. Again, this can only be done by examining the Flow associated with each major Crime Type (there are some similarities across some Crime Types, obviously). So to prevent Burglary Peaks, the Force would identify the main months – in this particular case it was September through November each year. Then locations – in this case mainly in student occupied rental accommodation. The plans to combat this are out in Stages 4 – 6 under Dispersed Execution in the top diagram above. But it is simple to state at this, Stage 3, what Outcome is wanted (Reduction in Burglaries), and What to Measure (number of Burglaries (and possibly number of successful Outcomes)), and the Method for measuring the result.
For example, working with a large Telecommunications provider: Working from Group Central Intent (All stakeholders will experience a better world through the company harnessing the power of communications), out to Divisional Central Intent (Provide responsive, reliable service over copper and fibre connections between exchanges and customer premises) out to the front-line where the impact of action can be measured (Roll-out fast broadband On-time and Fully-operating).
b. Describe how the Desired State improves the lives of Stakeholders: Here we describe the impact on the customers or public we are serving from their perspective.
For example, working with a large telecommunications provider: By rolling out fast broadband On-time and Fully-operating means customers will get a service where broadband works, does not buffer or drop, and with the speed and throughput they purchased.
For example, working with a large Police Force: By preventing Burglary Peaks (in September through November), residents (mainly students) will feel safer, and maintain belongings that are of value to them.
c. Prioritise Outcomes: Here we aim to determine, where there are several Outcomes or Sub-outcomes, what priority each one takes.
For example, working with a large telecommunications provider: Is the fact that broadband works more important than it buffering (obvious), is speed the next most critical, or is it that it doesn’t drop, or are customers OK with some buffering at the expense of speed?
For example, working with a large Police Force: Are students more concerned with hanging onto their valuables, rather than feeling safe (i.e. some people see a visible police presence as a good thing and feel safe, others see it as a worry that there needs to be a police presence, that bad stuff happens around here, and so feel unsafe).
Many organisations that we have had the pleasure to work with recognise that “staying out of trouble” is a never-ending, fire-fighting vicious circle. Working together, we’re starting to see how the 8 stages of Mission Command / Central Intent are the basis of a virtuous circle, and can lead organisations out of being reactive and into preventative states.
In building Mission Command / Central Intent, we’ve focused on Stages 1 – 3 in these blogs. This is because it is these stages that are most often overlooked, done badly, or not known about at all! Also, these stages are iterated and repeated working from the centre out towards the front-line. Once you get close to the front-line, then Stages 4 – 7, Dispersed Execution, will come into play.
We’ll take a look at these latter stages in this blog in a few weeks’ time.
Categories & Tags:
Leave a comment on this post:
You might also like…
From classroom to reality: Supply chain insights from Cranfield’s Manchester study tour
Each year, Cranfield University organises a study tour for MSc Logistics and Procurement & Supply Chain Management students. For the 2025–2026 cohort, students were given the option to select one of three study groups: ...
Systematic literature review – Managing duplicates
One of the questions which often comes up when discussing the SLR process is how do I manage my references in the most efficient way during the process of going from my search results to ...
Liverpool study tour: Connecting classroom learning with industry practice
From 21 to 24 April 2026, the MSc Logistics and Supply Chain Management cohort at Cranfield University took part in a valuable Liverpool Study Tour. The visit was a strong example of our close ...
From wave tank to ocean: seeing my work come to life in Indonesia
Gili Ketapang is a small island in East Java, Indonesia. Around 2% of the population of Indonesia lives without access to electricity but the InnovateUK-funded Solar2Wave project aims to make sure 100% of the ...
Accessing EBSCO eBooks offline from 19 May
From 19 May you will need to use the Thorium Reader app to download and read full EBSCO eBooks offline. This will not affect the way you read these eBooks online (via your browser) or ...
Bank holiday hours for Library Services: Monday 25 May
Library Services staff will be taking a break on Monday 25 May for the second May bank holiday. You will still be able to access all the online resources and help you need via our library ...